Comprehensive Major Remodeling Services

A major renovation requires an expert team capable of managing the hidden complexities of existing structures. Our four-phase process is built on deep discovery and careful planning, minimizing unforeseen issues and ensuring your home’s transformation is predictable, efficient, and of lasting quality. 

Clarity From Day One

The 4 Clear Phases of Remodeling

Phase 1: Discovery, Planning, & Permitting

Comprehensive site assessment, identification of structural risks, detailed finalization of architectural and engineering plans, contract signing, and securing all municipal permits and insurance. 

Client receives a robust plan that anticipates structural issues, leading to a secure, final contract and timeline. 

Phase 2: Demolition & Rough Structure

Controlled demolition and removal of debris, installation of temporary supports, execution of all major structural changes (additions, load-bearing removal), and primary re-framing. 

The new, secure structural foundation for the renovation is complete and verified, ready for systems installation. 

Phase 3: Systems Installation & Finishes Prep

Installation of all new mechanical, electrical, and plumbing (MEP) rough-ins. Followed by insulation, drywall installation, and exterior cladding/window installation. 

All critical, hidden systems are installed accurately and inspected, achieving a sealed and prepared interior. 

Phase 4: Transformation, Handover & Warranty

Installation of interior finishes, flooring, custom cabinetry, final fixtures, and detailed quality control (punch list). Followed by final inspections and system training. 

Client moves into a completed, high-quality, transformed space backed by our comprehensive warranty. 

FAQ

We Are Here To Help You With Any Questions You May Have

Absolutely. We prioritize team stability, which is essential for efficiency and quality control. Our core management and trade teams have worked together consistently for 5 to 7 years. This long-standing collaboration means clear communication, established standards, and predictable excellence on every job site.

Immediate problem resolution is our highest priority. We view job site issues as critical blockers that impact the entire schedule. Our project managers are empowered to make quick, necessary decisions, ensuring that any challenges are resolved within hours, not days, keeping your build on schedule.

The overall timeline depends entirely on the scope, complexity, and local permitting requirements. However, a typical custom new construction project takes between 10 to 18 months from groundbreaking to final handover. After our initial discovery phase, we will provide you with a precise, detailed milestone schedule we are committed to meeting.

The General Contractor or a dedicated Project Manager is on site daily to manage logistics, ensure adherence to blueprints, and maintain quality standards. Additionally, the owner is committed to scheduled high-level visits multiple times per week, guaranteeing direct, high-level oversight of your project’s progress.